China Power International Co., Ltd. Announced the Tender for the Fifth Batch of Production Projects in 2016

Tender No.: Tender Notice No. 201611080 Tender Code: CBL_20161115_188864545 Domestic tender Tenderer: China Power International Co., Ltd. Source of funding: Other China Power International Co., Ltd. 2016 Fifth batch of production engineering tender announcement Tender notice 201611080 commissioned by the tenderee to publicize the fifth batch of production of China Power International Limited in 2016 Tender. I. Basic information of the project Tenderee: China Power International Co., Ltd. Source of funding for the project: self-financing by the company No. Tender number Section name main indicators Bidding Document Price (yuan) 1 F02000212SZ02WZ060-120540000001 01- China Power Electric Macheng Tiemengang 50.44MW photovoltaic power station operation and maintenance project Scope of Bidding: The bidder shall be responsible for the overhaul and maintenance of the trivial equipment of the photovoltaic power plant in Tiemengang; the cleaning of the photovoltaic panels and the drainage of the site; the provision of operation and related management services and other work arranged by the tendering party as required, and the scientific and effective management of the overhaul of the operators. The contract period is 3 years and the contract is signed on a one-year basis. Every year, Party A evaluates Party B. If the evaluation is satisfactory, both parties have no objection and the contract will be automatically extended for one year. The annual contract price will remain unchanged; if the evaluation fails, Party A has the right to terminate the contract. 1000.00 2 F02000212SZ02WZ060-120540000002 02-Reform of HVAC System in Dabieshan Production Plant Area Scope of the tender: responsible for completing the supply, construction, production, installation, etc. within the construction drawings of the project; the replacement of the floor plates of the air-conditioning units of the combined control building and the electric dust roof; and the reinforcement of the air duct of the combined air-conditioning unit; The office building system rectifies the adjustment of the power distribution room and electronic air conditioners in the plant area, and the software configuration changes related to the renovation work. 1000.00 3 F02000212SZ02WZ060-120540000003 03-High-, medium-pressure cylinder overhaul of #2 machine Scope of the tender: The high and medium pressure cylinder overhaul items include the removal of the cosmetic board; the high and medium pressure cylinder body parts; the #1 to #4 bearings; the main valve, the adjustment of the door and the disassembly of the main oil pump; the project is not limited to the listed content. It should be marked by the completion of the overall project, including other unforeseen work involved in the project. 1, high pressure cylinder maintenance A, high pressure cylinder disassembly, including the main valve, adjust the door, guide steam pipe disassembly, cylinder disassembly, high school disassembly of the wheel assembly; B, and the outer cylinder connected to the external pipe fixed, disconnected, slope Port, welding, inspection and adjustment of main steam pipe and suction pipe hanger; C, #1, #2 bearings, thrust bearing, front and middle bearing case assembly and disassembly, adjustment; D, high pressure rotor extension shaft, main oil pump disassembly Maintenance and repair of components in the front tank of equipment, emergency breaking devices, and safety devices; E. Maintenance of high-pressure cylinders, including bearing boxes, external lower cylinders, cylinder internal sleeves, steam seals, etc. Finding and repairing, through-flow measurement of high-pressure cylinders, Treatment; F, lubrication oil tube of the bearing room, inspection of the top axle tubing; G, high school on the wheel concentricity, the center of measurement and adjustment; H, sliding pin system cleaning, lubrication; I, with the cylinder body, cylinder sleeve connected with the measuring element with the check . 2. Maintenance of medium pressure cylinders: A. Removal of medium pressure cylinders, including main valve, adjustable door, guide and disassembly of steam pipes, disassembly and assembly of cylinders, and disassembly and assembly of medium and low pairs of wheels; B. External pipes connected to external lower cylinders are fixed, Breaking, beveling, welding, inspection of steam pipes, extraction pipe hangers; inspection and adjustment of C, #3, and #4 bearings; inspection of oil pipes in bearing housings and top axle oil pipes; D, maintenance of intermediate pressure cylinders, among them Including bearing box, cylinder inner sleeve, steam seal body, etc. Finding and repairing, medium-pressure cylinder through-flow measurement and processing; E, middle-to-low wheel concentricity, center measurement adjustment; F, slide pin system cleaning, lubrication; G, Cooperate with the measuring element connected to the cylinder block and the cylinder sleeve. 1000.00 4 F02000212SZ02WZ060-120540000004 04 - Optimization of Retrofit of Cold End Equipment for Condenser No. 2 1 equipment transformation range 1.1 Re-optimize the internal structure of the condenser and retain it under the condition that the existing condenser shell and its supporting method remain unchanged, the connection with the exhaust port of the low-pressure cylinder remains the same, and the center position of the condenser does not change. Cooling tubes (replaced as stainless steel tubes), end tube plates, intermediate baffles, and related components inside the condenser, and the arrangement of the tube bundles are optimized to form a new type of condenser with better performance. 1.2 Replace the front water chamber. 1.3 condenser cooling tube material is TP316L. 1.4 Condenser pumping mode changed from series to parallel. 2 Project Content (mainly including but not limited to the following) 2.1 Provides the design, manufacture and installation of the condenser retrofit and is responsible for the performance indicators after the retrofit. 2.2 Remove all old tube bundles, bulkheads, tube plates, front water chambers and tube bundle accessories in the condenser. 2.3 Provide stainless steel pipes, composite tube plates, intermediate baffles, water chambers and other equipment used for reconstruction of condensers. 2.4 The newly designed and manufactured condenser tube sheets, partitions, all tube bundles, internal extraction passages and their accessories are assembled in the original condenser housing. The interface connections outside the original condenser remain unchanged in principle. In the event of a change, the bidder will be responsible for the construction of the relevant project. 2.5 Stainless Steel Cooling Pipe Installation: The sealing type between the stainless steel cooling pipe and the pipe plate adopts expansion joint and welding construction method. 2.6 stainless steel cooling pipe after the installation of irrigation test. 2.7 Condenser evacuation mode is changed from series to parallel, the high-pressure side evacuation pipeline is re-arranged, and the system adds 2 electric isolation valves. 2.8 Replacement of the sealing ring at the connection between the condenser and the water chamber of the condenser. 2.9 Responsible for the purchase of the electric isolation valve control cable, the purchase and installation of the cable tray, and the configuration of the reforming system DCS in the condenser suction line. 1000.00 5 F02000212SZ02WZ060-120540000005 05-Ping Yue second electric # 4 steam pump recirculation control valve procurement The renovation project is to renovate and replace the two steam-powered water pumps of Unit #2, a total of two sets of minimum flow valves, replacement control packages for the valve body part, pneumatic actuators, and valves of the scope package. 1000.00 6 F02000212SZ02WZ060-120540000006 06-Responsible for the modification of excitation regulator of No. 2 machine 1. The renovation project plans to replace the excitation regulator cabinet, exciter power rectifier cabinet, and generator excitation switch cabinet. The bidder shall comprehensively consider the operation of the original equipment, propose a technical scheme for the excitation system reform, and list of related equipment. 2. The transformation project will be replaced in the original cell and some secondary cables will be replaced. 1000.00 7 F02000212SZ02WZ060-120540000007 07 - Pingyi Electric #2 Boiler Pickling 1. Cleaning range: Chemical cleaning of the furnace economizer, steam drum (water side), concentration downpipe, water-cooled wall and its sewers. 2. Chemical cleaning media: HCl is used as cleaning media. 3. During the maintenance period of the tendering machine #2, the total duration of the chemical cleaning shall meet the tenderer's maintenance window plan. 4. Boiler chemical cleaning waste shall be handled by the bidder, and the discharge must comply with the provisions of GB8978. 5. After cleaning, the metal surface should be cleaned, basically no residual oxide and welding slag, no over-washing phenomenon that the metal coarse crystals precipitate, and there should be no copper plating; the average metal corrosion rate should be <8g/(m2?h ), The total amount of corrosion should be less than 80g/m2, the scale removal rate should be ≥90%, and the scale removal rate should be ≥95%. The surface after cleaning should be formed with a good passivation protective film without secondary corrosion and pitting. Valves, meters, etc. on fixed equipment should not be damaged. 1000.00 8 F02000212SZ02WZ060-120540000008 08 - Pingyi No. 2 boiler pickling Cleaning range: including economizer, water-cooled wall system, starter system, and high-added system. 1000.00 9 F02000212SZ02WZ060-120540000009 09 - Hiroseki sent a blower overhaul 1. The bidder shall be responsible for the dismantling and overhaul of the 4 primary air blowers and 4 blowers sent by the bid solicitor. 2. The bidder shall be responsible for the on-site demolition and installation of the wind turbines, and the transportation of the wind turbines, and shall be responsible for the safety of the equipment during dismantling and transportation. The resulting direct and indirect losses are the responsibility of the bidders. 3. The bidder is responsible for all costs of equipment, materials, spare parts, tests, repairs and labor during disassembly, overhaul, and transportation. 4. The bidder shall ensure that all spare parts for overhaul and replacement are original products (ie, the replaced spare parts must be the same type, same specification and same brand as the pre-repair equipment, and shall provide proof of origin), and all spare parts must be verified by the bid solicitor. Only agree can be replaced. For any spare part that has been replaced without the consent of the tendering party, the bidder must recondition the job unconditionally until it reaches the tenderer's request. 5. The bidder shall bear full responsibility for the quality of the inspection and the quality of the spare parts. All losses caused by the quality of the inspection and the quality of spare parts shall be borne by the bidders. 6. The bidder must unconditionally meet the tenderer's construction period requirements, and the resulting losses shall be borne by the bidders. 1000.00 10 F02000212SZ02WZ060-120540000010 10-flat booster electric fan overhaul 1. The bidder is responsible for the dismantling and overhaul of the 4 booster machines submitted by the bid solicitor. 2. The bidder shall be responsible for the on-site demolition of wind turbines (including temperature-replacement of the blankets), installation, and transportation of the wind turbines, and shall be responsible for the safety of equipment during dismantling and transportation. The resulting direct and indirect losses are borne by the bidders. 3. The bidder is responsible for all costs of equipment, materials, spare parts, tests, repairs and labor during disassembly, overhaul, and transportation. 4. The bidder shall ensure that all spare parts and materials (such as lubricating oil and grease) that are overhauled and replaced are original products (ie, the replacement spare parts must be the same type, same specification and same brand as the pre-repair equipment, and must provide the place of origin. Proof) All spare parts must be verified and agreed by the tendering party before they can be replaced. For any spare part that has been replaced without the consent of the tendering party, the bidder must recondition the job unconditionally until it reaches the tenderer's request. 5. The bidder shall bear full responsibility for the quality of maintenance and the quality of spare parts, and all losses resulting therefrom shall be borne by the bidders. 6. The bidder must unconditionally meet the deadline for the tenderer, and the resulting losses shall be borne by the bidder. 1000.00 11 F02000212SZ02WZ060-120540000011 11- The overall removal of closed layers of #1 and #2 furnaces The first phase of the boiler room EL37m meters to EL17.0m closed floor corrugated aluminum, keel, insulation, gypsum board and other areas of about 5000m2, and the removal of other ancillary equipment including roof fans, shutters, etc.. Other work that needs to be carried out to ensure the safe, economical and stable production and operation of the unit, such as the corrosion of exposed steel structures after demolition, falls within the scope of this tender. 1000.00 12 F02000212SZ02WZ060-120540000012 12- Pingyi Sandian additional portal train into the coal mining system prototype device construction Construction scope: Basic design according to the load data of the portal train sampling equipment provided by the constructor, or entrust the design institute with relevant design qualifications to carry out the scheme design; build the basis for the new sampling equipment and equipment installation; and establish the basis for the new filter equipment shifting And installation; fire hydrant pipe displacement and replacement of DN150 seamless steel pipe; gate train sampling equipment power supply line contact column, bracket, basic design and installation. (must visit the site) 1000.00 13 F02000212SZ02WZ060-120540000013 13-Adding wind and dust suppression network to Pingyi No. 2 Coal Power Station Construction scope: new wind-proof dust suppression net foundation, short column, ground beam, brick-blocking coal wall, etc., restoration of concrete floor damaged during excavation around the coal yard, dismantling and reconstruction of the original sprinkler around the coal yard System, underground pipelines. (must visit the site) 1000.00 14 F02000212SZ02WZ060-120541000014 14-Plating, One-Plating, One-Plating Machine #2 Machine Rotary Filtering System Steel Frame, Transmission Parts and Housing Replacement and Construction Transformation range: 1. The removal of the original four rotary screen equipment and civil engineering concrete; 2. The four rotating filter parts (exposed to the ground): steel structure, transmission part, spindle, bearing, reducer, motor, and housing Such as the selection of all equipment and materials technology, procurement and supply; 3, the new design of the rotating filter on the production, processing and installation of all parts; 4, all the civil engineering construction; 5, the responsibility of commissioning, performance testing and performance Examination and acceptance. 1000.00 15 F02000212SZ02WZ060-120541000015 15-Ping Electric Company Water Balance Test Scope of Bidding: The bidder is required to correctly evaluate the water level of the power plant, draw the unit water balance diagram, and formulate a practical section by analyzing the operation status of the unit, design data, equipment operation status diagnosis, on-site water quantity testing, and necessary calculation and analysis. Water technical measures and planning have enabled Pingdang's access, use and drainage to be used reasonably and scientifically. 1000.00 16 F02000212SZ02WZ060-120541000016 16- Pingyi Electric Boiler Equipment and Pipeline Thermal Insulation Construction The installation and rectification of the insulation of the equipment and pipelines in the closed layer of the boiler shall be carried out. 1000.00 17 F02000212SZ02WZ060-120541000017 17- Pingyi Electric U105A Overhaul Boiler Tube Intelligent Testing Equipment Purchase One boiler boiler tube intelligent detector, including but not limited to the following: 1 boiler intelligent detector of power station boiler, 1 intelligent computer host, 1 digital cable connected, 1 host charger, and the number of detection probes meets the requirements The testing requirements for the materials, specifications (see table below) of the six boilers of the company are as follows: 2 meters, 4 meters, 6 meters, 8 meters, and 10 meters. One cable is tested. The cable and instrument and probe links are standard connectors. Common to each other. One on-site operation package, one power cord, one portable product protection box, equipment drawings, specifications, usage instructions, and product shipment certificate. 1000.00 18 F02000212SZ02WZ060-120541000018 18-Wuhu Power Generation #1 High and Medium Pressure Cylinder Demolition Inspection, #5-6 Support Bearing Vibratory Treatment Implementation Coordination and Generator Maintenance Partial Overhaul The #1 machine high and medium pressure cylinder demolition inspection, the #5-6 support bearing vibration treatment and the maintenance of generator maintenance, mainly based on the problems in the operation of the unit, combined with the existing problems of the other units of the same unit, through the overhaul Turbine units undergo a full overhaul. In order to improve the reliability and economic efficiency of the unit. 1000.00 19 F02000212SZ02WZ060-120541000019 19- Wuhu Power Generation #1 Furnace 5 Units The scope of this transformation project Wuhu Power Generation Co., Ltd. Wutai 5 sets of # 1 furnace raw coal bunker installed warehouse wall rapping device project, is now scheduled to be in the lower part of the original coal warehouse, around the coal feeder inlet gate door upper and lower pipe section, determine the installation location, plus Install the air hammer device, install the control device and debug it normally. When the coal feeder stops the coal, the rapping wall shaker device can start the rapping device to run on its own, shorten the time during which the coal feeder is blocked and not coal, reduce the manpower consumption, reduce the consumption of combustion-supporting oil, and reduce the impact on the unit load. 1000.00 20 F02000212SZ02WZ060-120541000020 20 - Wuhu Power Generation #1 Oven Reheater Export Tube Sets and Desuperheater Type Modification (Construction) 1 construction scope 1. Replacing the entire body of the desuperheater of the A/B side reheater of # 1 furnace (the new desuperheater is shown in Annex 9): Including the reheater desuperheater outer cylinder body and the connection pipe resection and welding Rehabilitation and restoration of ancillary facilities such as rehabilitation, roof cladding, pipe support and hangers, and fixtures. 2. Replacement of the #1 furnace low-temperature reheater, replacement of the vertical outlet tube set (new tube set as shown in the attached diagram of attachment 6), and installation of soot blowing gas source at low re-entry: 1) Installation (including all pipe fittings), new supply cryogenic reheater transition pipe group and vertical outlet pipe group (including all pipe row attachments) including the original low-temperature reheater transition pipe group and vertical outlet pipe group The vertical outlet pipe group cuts through all the original sealing devices of the ceiling pipe and restores the new supply ceiling sealing device (excluding the construction of the heat-insulating and refractory materials inside the ceiling box), and the pipes are transported to the furnace and Cuts and restorations (including seal fins and other accessories) required to wear the ceiling. 2) Including #1 furnace A side low re-entry (boiler elevation 49.8M layer) to screen outlet blowing air source steam source mother tube (boiler elevation 71.7M layer) installed soot steam pipeline, valves and related measurement and control equipment . 1000.00 twenty one F02000212SZ02WZ060-120541000021 21-Wuhu Power Generation 2017-2019 Boiler Furnace Metal Lifting Platform Loading and Unloading Maintenance Construction scope 1. The metal lifting and overhauling platform for boilers #1 and #2 in 2017-2019 will be dismantled and operated 6 times (2 sets of platforms/times). The detailed work is as follows: 1) The erection of the metal lifting and overhaul platform during maintenance and Demolition work; 2) Routine inspection, maintenance and cleaning of all mechanical equipment, transmission components, lifting ropes, platform components and electrical and control system equipment before erection of the metal lifting and overhauling platform, including adjustment of the top pulley block (shift) 3) Commissioning and adjustment of the boiler metal lifting and overhaul platform after installation; 4) Operation, monitoring, inspection and maintenance of the boiler metal lifting and overhaul platform during use (this work should be arranged in accordance with the actual time of the actual maintenance of the bidders) 5) Timely resolution of problems found during the use of the boiler metal lift maintenance platform 6) Shipment of the boiler metal lifting and overhaul platform for storage and transportation, and the demolition of components for inventory and packing and storage. 2. The details of boiler metal lifting and overhaul inspection platform inspection for 2017-2019 are as follows: 1) Boiler metal lifting and overhaul platform is returned to the factory to perform load and static test 1 times (2 sets/tablet) 2) Broken rope protector (12) Only once a year, return to the factory for dismantling inspection, maintenance and decoupling tests; 3. The three-level maintenance of on-site equipment of the boiler metal lifting and overhaul platform in 2017-2019 includes (but is not limited to) the following main contents: 1) Three-level maintenance of the external equipment of the boiler metal lifting platform of #1 boiler 1 Inspection and maintenance of wire rope unwinding inspection, inspection and inspection of top pulley dismantling, inspection and repair of internal gears of hoist reducer, standard oil replacement of gearbox, inspection and repair of brakes, inspection and inspection of couplings, inspection and maintenance of brakes, and maintenance Switch inspection, maintenance, inspection and maintenance of electronic control equipment; 2) Three-level maintenance of furnace equipment outside the metal lifting platform of boiler #2 1 station: Inspection and maintenance of wire rope unrolling inspection, inspection and maintenance of top pulley removal and maintenance , Check and repair of the internal gear of the gear box of the hoisting gear, standard oil replacement of the gearbox, inspection and inspection of the brake, inspection of the coupling, inspection and maintenance, inspection and inspection of the brake, inspection of the limit switch, inspection and repair, inspection and maintenance of the electronic control equipment, etc. . 1000.00 twenty two F02000212SZ02WZ060-120542000022 22-Wuhu Power Generation 2017-2020 Company Lifting Equipment Maintenance The bidding company's all-round lifting equipment and repair and maintenance of the chain hoists, jacks and other lifting equipment, high pole lamp and other equipment maintenance and repair services throughout the year. It also includes the lifting equipment that will be added to the company’s production technical upgrading during the year. (The specific quantity parameters shall be based on the lifting equipment actually installed on the site; the maintenance scope shall be all lifting equipment, pole lights and iron remover in the company area). Responsible for the bidding company's lifting equipment, high pole lamp mechanical parts, electrical parts (including wire ropes, cables, switches, electrical power, control, protection, auxiliary equipment, electrical components, control cabinets, warning lights, rails, etc. Between the electrical part of the heavy equipment and the electrical equipment of the owner, the cable head of the lower outlet of the main switch of the power distribution room shall be used as the boundary), as well as the hoisting point of the equipment, the inspection of the steel structure of the supporting part, and the corrosion and maintenance of the electric hoist track (refueling), Cleaning, deficiencies, maintenance, replacement of parts and components to ensure that the equipment is always in good condition and ready for use. Keep the appearance of the equipment clean and tidy, keep the structure of the equipment intact, and maintain the performance and accuracy of the equipment. The device is responsible for timely repair of partial paint shedding. The daily maintenance of the high pole lamp (including lamp and bulb replacement), the required scaffold for the maintenance of the high pole lamp repair, lamp, and pier pole lamp are provided by the tenderer. Maintenance and repair period: March 1, 2017 to February 28, 2020. 1000.00 twenty three F02000212SZ02WZ060-120542000023 23-Well oxide surface cleaning and valve (replacement) construction of #1 and #2 furnaces for 2017 in Wuhu Power Generation In 2017, it is necessary to combine the programmatic nature of the unit and the consolation and maintenance to clean and restore the #1/2 boiler thermal surface oxidation supersonic detection pipe, and also to desuperheater, reheater desuperheater, header, body heating surface, etc. of the boiler. Inspect and overhaul, as well as part of the valve return to the factory to repair the site cut off and welding recovery construction, in 2017 to implement the # 1/2 furnace heating surface oxide skin cleaning and pipe valve (replacement) construction works. 1000.00 twenty four F02000212SZ02WZ060-120542000024 24-Wuhu Power Generation 2017-2019 Roller Cover and Milling Plate Lining The temporary repair calculation for the surfacing is estimated to be about 100 sets of HP1063 grinding mill roller sets (the amount of welding wire is about 250KG each, totaling about 25000KG) and HP1063 mill grinding board liner on-line welding repair 30 sets (wires Each unit is about 300KG, totaling about 9000KG). 1000.00 25 F02000212SZ02WZ060-120542000025 25-Wuhu Power Generation 2016-2018 House and Auxiliary Facilities Civil Engineering and Repairing Project 1. The maintenance of all interior and exterior walls, floors, ceilings and ceilings, roofs, doors and windows of the main buildings, auxiliary buildings, warehouses, office buildings, production buildings, trestle bridges and other structures within the factory area. 2. Maintenance of all ancillary facilities such as roads and fences, guardrails, and rainwater drainage systems in the plant area. 3, equipment, pipelines, metal platforms, railings and other anti-corrosion paint repairs. 4. The old factory belongs to the maintenance of the buildings of Wuhu Power Generation Company. (such as: training building, communication building, etc.). 5, due to the daily maintenance of the unit, planned maintenance, repair and repair of the sporadic civil construction work. 6. Dust removal for equipment and facilities (coal, silt), daily equipment overhaul, unit plan maintenance, etc. 1000.00 26 F02000212SZ02WZ060-120542000026 26-Wuhu Power Generation: Factory Sanitation and Equipment Cleaning Services (2017-2018) I. Environmental Sanitation Area of ​​the Factory 1. Road and parking lot sanitation; 2, No. 1 and No. 2 furnace main plant area sanitation; 3. Chemical division area; 4. Expansion of the end-middle section of the inner wall of the toilet; 5, including the zero-meter floor drain of the boiler plant, Timely dredging of rainwater wells to maintain smooth drainage; 6. Removal and transportation of garbage; 7. Temporary cooperation work during the overhaul of units (including A, B, and C repairs) and departments (including, but not limited to, inspections of health assault, production Rescue, material handling, material transport, etc.). II. Cleaning range of equipment and facilities below 2 meters at the production site 1. Steam engine room; 2. Boiler body; 3. Oxygen removal coal warehouse; 4. Electrostatic dust removal; 5. Others. 1000.00 27 F02000212SZ02WZ060-120542000027 27- Yaomeng Power Generation #4 Unit B Repair #5 Unit A Scaffolding Thermal Insulation Project 1. Cooperate with the erection and demolition of scaffolds in the B repairs of #4 unit and the A repair project of #5 unit, and the disassembly and assembly of thermal insulation and guards. Except for special technical transformation projects, the rest of the projects are within the scope of this specification, and the boundary is subject to the division of the Ministry of Science and Technology; 2. The scaffolding and insulation project of the B4 repair and #5 unit A repair temporary projects and the Ministry of Health and Technology shall be coordinated. ; 3, # 4 unit B repair and # 5 unit A repair items are subject to change, according to the actual project shall prevail. 1000.00 28 F02000212SZ02WZ060-120542000028 28- Yao Meng power generation # 3, 4 unit fuel coal handling system commissioned #3, 4 units 2 × 300MW operation, test, regular work, cleaning and supervision of a coal handling system, including coal, coal storage, coal measurement, Zhongping coal and electricity equipment, coal fire protection system and other areas Internal equipment (applied). Ensure the safe, economical and stable operation of the operating equipment. 1000.00 29 F02000212SZ02WZ060-120542000029 29- Maintenance and Maintenance of Fuel Coal Handling System for #2-6 Unit of Yaomeng Power Generation #2-6 Three sets of coal handling systems and their ancillary equipment for overhaul and maintenance. #2 unit 300 MW system, #3, 4 unit 2 × 300 MW system, # 5, 6 unit 2 × 600 MW system, including coal, unloading and storage of coal, into the coal metering equipment, sampling equipment, Zhongping coal-fired coal transmission channel supporting equipment, coal quality center sample preparation equipment, fire control systems. Ensure that the maintenance equipment is safe and reliable. 1000.00 30 F02000212SZ02WZ060-120542000030 30- Maintenance and Repair of Partial Air Compressor for #2-6 Unit of Yaomeng Power Generation Yaomeng Power Generation Corporation's #2-4 unit has 5 XF200S air-cooled air compressors produced by Ingersoll-Rand, and 5 units and 6 air compressors supplied by Atlas, which are used for the maintenance of GA250-8.5 instrument air compressors produced by Atlas. Maintenance period: January 1, 2017 - December 31, 2018. 1000.00 31 F02000212SZ02WZ060-120542000031 31-Yao Meng Power Generation #4 Furnace Blower Retrofit The fan body, fuel station, and auxiliary equipment (all cables except for the main motor power cable and related switch modifications) are supplied; more than two oil stations are used for the #3 furnace blower. Including the removal of the original equipment and the installation of new equipment. 1000.00 32 F02000212SZ02WZ060-120542000032 32-Yao Meng Power Generation #4 Excitation Regulator Upgrade 1, # 4 machine ABB excitation regulator two channel motherboard and power components upgrade, the original system configuration from F to upgrade to 6080. 2, PMU interface capacity increase to meet the grid scheduling requirements. 3. Add 1 set of ECT control terminal and 1 set of de-excitation switch and power supply. 1000.00 33 F02000212SZ02WZ060-120542000033 33- Yaomeng Power Generation #2-6 Unit Lifting Equipment Maintenance Yaomeng Power Generation Company's #2-6 units have a total of 202 large and small lifting equipment, and cats are equipped with 50 units to maintain the equipment. Maintenance period from January 1, 2017 to December 31, 2018. The number of resident permanent members of the company is not less than six, and at least eight persons are required to stay in the factory during the period of repair and maintenance of the unit. 1000.00 34 F02000212SZ02WZ060-120542000034 34-Yao Meng-generation #5, 6 Excitation Regulator Motherboard and Communication Interface Upgrade 1, # 5, 6 machine ABB excitation regulator two channel motherboard and communication interface upgrade, the original control system configuration from 5000 to 6800 upgrade, power components old. 2. The PMU interface is increased to meet the grid dispatch requirements. 3. Add 1 set of ECT control terminal. 1000.00 35 F02000212SZ02WZ060-120542000035 35-Yaomeng Power Generation #2-6 Ultra Low Emission Improvement Performance Test Ultra-low emission project performance test project after transformation: 1.#2-6 unit denitration system modification performance evaluation test; 2.#2-6 unit desulfurization and cooperative dust removal system performance test; 3. Environmental emission index test test. The work contents of the bidder mainly include: responsible for the preparation of technical performance test programs and measures, completion of performance test related acceptance visas, submission of performance test records, reports, optimization of operational measures, and relevant documentation. 1000.00 36 F02000212SZ02WZ060-120542000036 36- Upgrade of the MTSI Monitoring System for #5 and 6 Units of Yaomeng Power Generation This upgrade shall preserve the existing #5 and 6-machine MTSI control system cabinets, retain the existing sensors and various TSI parameter monitoring modules within the framework, and require the upgraded power supply and frame to fully implement the original TSI parameters. Monitor the function of the module. In this upgrade project, the bidder is responsible for dismantling the card components and wiring in existing MTSI system control cabinets of #5 and 6 aircrafts, designing, supplying, installing, debugging, testing and trial-launching a new set of MTSI systems, including MTSI cabinets. Demolition of the original framework, new power supply, frame, installation of card components, cable laying and wiring, system installation, logic configuration and debugging.